British Rail Class 370

British Rail Class 370
Advanced Passenger Train–Prototype

370 003 at Carlisle
In service 1980-1986
Manufacturer BREL
Family name APT
Number built 3 trainsets
Formation 14 cars per trainset
Operator InterCity
Line(s) served West Coast Main Line
Specifications
Height 3.5 m (11 ft)
Maximum speed 155 mph (249 km/h) (Design)
125 mph (201 km/h) (service)
Weight 434 tonnes (427 long tons)
Electric system(s) 25 kV AC Overhead
UIC classification 2'2'2'2'2'2'2'+Bo'Bo'+Bo'Bo'+2'2'2'2'2'2'2'

British Rail's Class 370 tilting trains, also referred to as APT-P (meaning Advanced Passenger Train Prototype), were the pre-production Advanced Passenger Train units. Unlike the earlier experimental gas-turbine APT-E unit, these units were powered by 25kV AC overhead electrification and were used on the West Coast Main Line between London Euston and Glasgow Central. The APT-P is the most powerful domestic train to have operated in Britain, the eight traction motors fitted to the two central Motor Cars giving a total output of 8,000 horsepower (6,000 kW). This enabled the train to set the UK rail speed record of 162.2 miles per hour (261.0 km/h) in December 1979, a record that stood for 23 years.[1]

Due to ongoing technical problems with these pre-production units, and a lack of cash or political will to take the project forward, the planned APT-S production-series units were never built, but did influence the design of the later InterCity 225 sets designed for the East Coast Main Line electrification. The influence is strongest with the Class 91 locos which took many features from the APT powercars. The technology was later sold to Fiat and used for improving their second generation Pendolino trains which have been used worldwide, including the West Coast Main Line.

Contents

Numbering

Units were numbered 370001-370006 (plus a spare driving car labelled 370007) and were formed as follows:

A full train was made up of two units running back-to-back, with the two motor cars adjoining. The motor cars had no seating accommodation or through-gangway, so the two halves of the train were unconnected for passengers.

Withdrawal

All six units were withdrawn during 1985-1986, and most cars were quickly scrapped. Only a handful of cars have survived;

See also

References

Literature

External links